Slab size to cubic yards and bags, then the whole price chain: gravel base, mesh or rebar, forms, pour and finish hours, overhead and margin. Slabs, footings and pads only.

The slab feet and inches, outside of forms

Shape
ft
ft
in
Why this number

4 in for patios, walkways and shed pads. 5 to 6 in where cars or equipment sit. Footings follow your code and soil.

Thickness quick pick

400 sq ft, 80 lnft of edge, 4.94 yd before waste

%
Why this number

Uneven subgrade, spillage and what stays in the chute. 5 to 10% is normal; go higher on rough grade.

Why this number

Area, perimeter and volume multiply. Sundries, equipment and strip time stay per pour, so keep the count to what you pour in one day.

The job

Concrete supply
Reinforcement
Finish
Site access
Why this number

Person-hours stay the same. Crew size sets the clock hours, which tells you if it is a morning or a day.

Your numbers prices, production rates, margin

Concrete

$ / yd
Why this number

Our starting point for a 3,000 to 4,000 psi mix delivered. Plant prices were unreachable when we built this on Sep 21, 2026, so confirm with your plant.

$ / order
Why this number

$0 assumes delivery is in the per-yard price. Add a fuel or trip charge if your plant bills one.

yd
Why this number

Plants charge extra when the truck leaves with less than a minimum, often 4 to 6 yards.

$
Why this number

Flat fee added once when the order is under the threshold. Some plants bill per missing yard instead.

Bags

$
Why this number

Check your supplier. Big-box retail moves a lot.

$
$
cu ft
Why this number

Manufacturer published yield for a standard concrete mix (Quikrete lists 0.60 cu ft). Confirm on your bag.

cu ft
Why this number

Manufacturer published yield, 0.45 cu ft. Confirm on your bag.

cu ft
Why this number

Manufacturer published yield, 0.375 cu ft. Confirm on your bag.

Base, reinforcement, forms

$ / yd
Why this number

Crushed stone or road base delivered. The tool adds 10% for compaction.

in
Why this number

4 in is typical under a residential slab. Go deeper on soft or wet soil.

$ / sq ft
Why this number

6x6 welded wire, sheets or roll, including chairs.

$ / lnft
Why this number

1/2 in bar with chairs and ties. The grid is 18 in on center both ways plus 10% for laps.

$ / lnft
Why this number

2x4 or 2x6, stakes, nails and form oil per foot of perimeter. Assumes new lumber each job; drop it if you reuse forms.

$ / sq ft
$ / lnft
Why this number

Fiber or foam joint where the new slab meets old concrete. Counted along the whole perimeter when the toggle is on.

$
Why this number

Curing compound, form release, blades, tie wire.

Production, per person-hour

lnft / hr
Why this number

Stake, level and brace 2x4 forms on prepared grade. Time your crew and replace it.

sq ft / hr
Why this number

Rake 4 in of gravel and run a plate compactor over it.

sq ft / hr
sq ft / hr
Why this number

Cut, tie and chair a grid. Roughly half the speed of mesh.

yd / hr
Why this number

Chute placement with the crew raking and screeding.

yd / hr
Why this number

Half the truck rate. Every yard is about 10 barrow loads.

sq ft / hr
Why this number

Bull float, edge, joint, broom. Trowel adds 25%, exposed or stamped adds 60% on top.

person-hr / pour

Labor, equipment, overhead, margin

$ / hr
Why this number

What a crew hour costs you, not what you charge. BLS publishes the median wage for cement masons and concrete finishers (47-2051); it was unreachable on Sep 21, 2026. A mid-20s wage plus 25 to 30% for tax and insurance lands near $32. Confirm.

$
Why this number

Mixer, screed, power trowel, plate compactor: rental or wear on your own.

%
Why this number

Share of the price you keep. Price = cost ÷ (1 − margin). 30% is a common target; it is not 30% markup.

$
Why this number

A truck, a crew and a morning have a floor no matter how small the pad is.

Overhead
%
Why this number

Truck, insurance, phone, yard, the hours you spend quoting. 12% is a starting point.

Price to send

$3,080at 30.0% actual margin

Based on your inputs. Default prices and work speeds are examples, not local market averages. Sales tax is not included.

Ready-mix to order5.5 yd
Person-hours16.0 hr
Your cost$2,155
Estimate preview400 sq ft · 4.94 yd net
Customer-facing line items
Site prep and gravel base400 sq ft, 4 in compacted$492
Forms and reinforcement80 lnft of forms, wire mesh$663
Concrete (5.5 yd ready-mix, 4 in)400 sq ft$1,315
Pour and finish (broom)chute placement, screed, float, edge, broom$444
Cleanup and form strip2.0 person-hr, haul off, curing compound$166
Total$3,080

Your side (not on the estimate)

Materials
$1,345
Labor
16.0 hr × $32 = $512
Equipment
$75
Overhead
$223
Cost
$2,155
Profit
$925
Same price as markup
43%
Clock time
5.3 hr, one day for a crew of 3

Concrete: 5.5 yd ordered (4.94 net + 10% waste, rounded up to the quarter yard). Base: 5.43 yd. Person-hours: forming 4.0 hr, base 2.0 hr, mesh 1.6 hr, placing 3.7 hr, finishing 2.7 hr (broom), strip and cleanup 2.0 hr. Rounded up to the half hour.

$3,0805.5 yd · 16.0 hr · 30.0% actual marginSee breakdown

How to estimate a concrete job with this calculator

A concrete estimate is area, cubic yards, the concrete itself, then base, reinforcement, forms, labor hours by task, overhead and margin. Most concrete calculators stop at the yards and the bags. This one keeps going to a price you can send, and it shows every step so you can argue with it.

  1. Measure the slab. Length, width and thickness, or a diameter for a round pad. Tap a preset for a shed pad, patio, garage or driveway. The tool gives you square feet, feet of edge and net yards before you go further.
  2. Pick the supply. Ready-mix truck or bags. Under 5 yards the plant adds a short-load fee; over 150 bags the tool tells you to call the plant.
  3. Set the job. Gravel base, wire mesh or #4 rebar, forms, vapor barrier, expansion joint against an existing slab, the finish, whether the truck can reach, and how many people are on the crew.
  4. Check your numbers. Open "Your numbers" and replace the ready-mix price, bag prices, material prices, production rates, loaded labor cost, overhead and margin with your own. Every default is labeled.
  5. Read the price. The headline is what to send. Below it: yards or bags to order, person-hours, a customer-facing line item list, and a "your side" panel with cost, overhead, profit and the clock hours for your crew.
  6. Copy the lines. Paste them into your estimate, or turn them into a WinPal estimate with your logo and terms.

Cubic yards = length × width × (thickness in inches ÷ 12) ÷ 27. Add 5 to 10% waste and round up to the quarter yard.

Price = (labor + materials + equipment + overhead) ÷ (1 − target margin). Divide, don't multiply. At 30% margin on $2,155 of cost, dividing by 0.70 gives $3,080. Multiplying by 1.30 gives $2,802, which is a 23% margin wearing a 30% name tag.

How much does it cost to pour a 20x20 concrete slab?

With the calculator's defaults, a 20x20 patio at 4 in with a compacted gravel base, wire mesh, new forms and a broom finish prices at $3,080 at a 30% margin, or $7.70 per sq ft. That's 5.5 yd of ready-mix and 16 person-hours, about five and a half clock hours for a crew of 3. Hypothetical job, real math.

StepMathResult
Area and edge20 × 20; 2 × (20 + 20)400 sq ft, 80 lnft
Cubic feet400 × 4 ÷ 12133.3 cu ft
Net yards133.3 ÷ 274.94 yd
Ordered yards4.94 × 1.10 waste, rounded up to the quarter yard5.5 yd
Concrete5.5 × $150, no short-load fee at 5 yd or more$825
Gravel base400 × 4 ÷ 12 ÷ 27 × 1.1 compaction = 5.43 yd × $45$244
Mesh, forms, sundries400 × $0.35; 80 × $1.20; $40$140 + $96 + $40
Materials$825 + $244 + $140 + $96 + $40$1,345
Person-hoursforming 4.0 + base 2.0 + mesh 1.6 + placing 3.7 + finishing 2.7 + strip 2.0, rounded up16 hr
Labor16 × $32 loaded$512
Equipment and overhead$75; 12% of $1,857$75 + $223
Cost$512 + $1,345 + $75 + $223$2,155
Price at 30% margin$2,155 ÷ 0.70, rounded to $5$3,080

Swap the mesh for a #4 rebar grid at 18 in and the same slab goes to $3,910 (660 lnft of bar, 18 person-hours). Make it a smooth trowel finish and it's $3,130. Put the truck on the street with a wheelbarrow run and it's $3,285. Each shows up as its own change in the customer lines, which is why the estimate lists them separately.

Concrete calculator: yards or bags?

Bags make sense up to roughly a yard, which is 45 bags of 80 lb. Past that you're mixing all day and the truck is cheaper per yard anyway. The calculator gives you both numbers so you can see the crossover on your own job.

Bag sizeYield per bagBags per cubic yardBags for a 20x20 at 4 in (with 10% waste)
80 lb0.60 cu ft45245
60 lb0.45 cu ft60326
50 lb0.375 cu ft72392

The 80 lb yield is a standard-mix reference; the smaller sizes are proportional estimates. Confirm the actual yield on your bag, since products vary. The bag count includes waste and rounds up, so a 12x16 shed pad at 4 in is 118 bags of 80 lb, or 2.75 yd from the truck.

The short-load fee is the catch on the truck side. Plants set a minimum, often 4 to 6 yards, and charge a flat fee or a per-yard fee below it. The calculator adds $100 under 5 yd by default, so that 12x16 pad prices its concrete at 2.75 × $150 + $100 = $513. Order 5.5 yd for a 20x20 and the fee disappears. If a job sits just under the line, ask what a 5 yd order costs; sometimes the extra half yard is cheaper than the fee.

Waste is the other number people skip. Subgrade is never dead flat, chutes hold concrete, and a truck that comes up short at the far corner costs more than the 10% you should have ordered. The tool defaults to 10% and rounds up to the quarter yard.

Concrete slab cost calculator by size

At the calculator's defaults (4 in, gravel base, wire mesh, broom finish, truck access, crew of 3), the price per square foot falls as the slab grows, because forms, cleanup, equipment and the truck are mostly fixed. Every number below comes from the engine; the driveway row is a 10x40 at 4 in.

SlabReady-mixPerson-hoursMaterialsPrice at 30% marginPer sq ft
12x16 shed pad, 4 in2.75 yd + short-load fee10 hr$804$1,905$9.93
20x20 patio, 4 in5.5 yd16 hr$1,345$3,080$7.70
10x40 driveway, 4 in5.5 yd17 hr$1,369$3,170$7.92
24x24 garage, 6 in11.75 yd24 hr$2,471$5,290$9.18
30x40 slab, 4 in16.5 yd39 hr$3,836$8,240$6.87
40x60 slab, 4 in32.75 yd71.5 hr$7,499$15,765$6.57

Two things to notice. The garage costs more per foot than the patio because 6 in of concrete is half again as much per square foot, and cars want it. And the 40x60 is a floor, not a quote: at 2,400 sq ft you're into a pump, four trucks timed back to back and more hands on the screed, and the calculator warns you about it.

A concrete driveway cost calculator is the same math with a preset: the 10x40 driveway above lands at $3,170. Thicken it to 5 in for a truck, or 6 in for anything heavier.

How the calculator works out concrete labor

Labor is priced by production rate per task, in person-hours, then divided by the crew to get clock time. That way a crew of 3 and a crew of 5 pay the same labor for the same slab; only the day gets shorter. All of the rates below are our starting points, labeled as assumptions in the panel. Time your crew on the next pour and replace them.

TaskPriced byDefault rate
Forminglinear feet of perimeter20 lnft per person-hour
Base spread and compactsquare feet at 4 in200 sq ft per person-hour
Wire meshsquare feet250 sq ft per person-hour
#4 rebar gridsquare feet120 sq ft per person-hour
Place and screed, truck can reachcubic yards ordered1.5 yd per person-hour
Place and screed, wheelbarrowcubic yards ordered0.75 yd per person-hour
Finishing, broomsquare feet150 sq ft per person-hour
Finishing, smooth trowelsquare feetbroom time + 25%
Finishing, exposed or stampedsquare feetbroom time + 60%, plus its own materials line
Strip forms and clean upper pour2 person-hours

The total is rounded up to the half hour and priced at $32 an hour loaded, a mid-20s wage plus 25 to 30% for tax and insurance. That's what the hour costs you, not what you charge. For the 20x20 patio, 16 person-hours is 5.3 clock hours for a crew of 3: that is an allocation of working time, not a promise of elapsed job time. Curing, weather, return trips and form-removal timing need a separate schedule.

Finish type moves the finishing line only. Smooth trowel adds 25% to the finishing time, exposed or stamped adds 60%, and the tool flags stamped work because the stamps, color, release and sealer are not in that number. Wheelbarrow access doubles the placing time and nothing else, which is why a bad driveway costs the 20x20 about $200 more.

Common questions about concrete costs

How much would it cost to pour a 20x20 concrete slab?

With this calculator's defaults, a 20x20 slab at 4 in with a gravel base, wire mesh and a broom finish prices at $3,080, or $7.70 per sq ft, on 5.5 yd of ready-mix and 16 person-hours. That assumes $150 per yard, $32 loaded labor, 12% overhead and a 30% margin. Change any of them and the price moves.

How much would it cost to pour a 30x40 concrete slab?

A 30x40 slab at 4 in with the same defaults comes to $8,240, or $6.87 per sq ft: 16.5 yd of ready-mix, 39 person-hours (13 clock hours for a crew of 3), $3,836 in materials and $1,248 in labor before overhead and margin. Two trucks, so book the second delivery before the first one runs dry.

How much would a 40x60 concrete slab cost?

The calculator gives $15,765 for a 40x60 slab at 4 in, or $6.57 per sq ft, with 32.75 yd of concrete and 71.5 person-hours. Treat that as a floor. At 2,400 sq ft confirm truck capacity, delivery sequencing, pump needs and crew size with your supplier, and the tool flags it as a large pour for that reason.

How much should a 12x16 concrete slab cost?

A 12x16 shed pad at 4 in prices at $1,905, or $9.93 per sq ft, with defaults. That is 2.75 yd of ready-mix plus a $100 short-load fee, 10 person-hours and $804 in materials. Small slabs cost more per foot because forms, cleanup and the truck don't shrink with the pad.

What is the concrete calculator formula?

Cubic yards = length (ft) × width (ft) × thickness (in) ÷ 12 ÷ 27, plus 5 to 10% waste, rounded up to the quarter yard. A 20x20 slab at 4 in is 133.3 cu ft, ÷ 27 = 4.94 yd, × 1.10 = 5.43, so order 5.5 yd. For a circle, the area is π × radius².

How many 80 lb bags of concrete are in a yard?

45. An 80 lb bag of standard concrete mix yields about 0.60 cu ft, and a cubic yard is 27 cu ft, so 27 ÷ 0.60 = 45 bags. A 60 lb bag (0.45 cu ft) takes 60 per yard and a 50 lb bag (0.375 cu ft) takes 72. The smaller bag yields are proportional estimates; confirm the yield on your specific bag.

Does this concrete cost calculator include labor?

Yes, and it shows the hours separately. Forming, base, mesh or rebar, placing, finishing and cleanup each get a production rate, the total is rounded up to the half hour and priced at your loaded rate. The customer lines carry the labor inside them; the navy panel shows it on your side.

Turn this into an estimate your customer can sign.

Paste the line items into WinPal, add your logo and terms, and send it from the truck before the plant closes. Estimates, invoices and payments live in the same app.